Tag Archives: Prime Ministers Office

Some Good Free Trade News For Canada From Across The Pacific

In the midst of Mark Carney’s Asian summiteering this week, little attention has been paid to key developments that should not be overlooked.

Of particular note was the conclusion of trade negotiations with the Association of Southeast Asian Nations (ASEAN) toward the ASEAN-Canada Free Trade Agreement (ACAFTA), and with the Philippines toward a bilateral deal. Both are meant to be signed in 2027.

A Fraction Compared To The States But….

While each represents a fraction of Canada’s two-way trade with the United States and other major partners such as China and the European Union, each of these agreements entails sizeable commercial possibilities for both sides, especially with the impressive growth of these Asian economies over the last decade.

Although the final text is still being ironed out, the Philippine agreement is of particular importance, part of the Carney government’s “variable geometry” strategy to diversify and strengthen commercial and geopolitical relationships.

As the PMO’s summary of the Manila meeting states: “Canada is transforming our economy to be less reliant on a single trading partner and more resilient to global shocks.”

Potential For Trade Growth

There’s a long road ahead to grow Canada-Philippine business, with only about $6.0 billion worth of bilateral goods and services trade (as of 2025). But if you take the optimistic read-out at face value, there are promising prospects coming down the pike:

“The Philippines has an economy of $680 billion and a market of more than 110 million people, and it is one of the fastest-growing economies in Asia. Once in force, this agreement could increase exports up to three times by 2035 and provide Canadian businesses the access and certainty they need to compete and win in this market, particularly in agriculture and forest products.”

The latest announcement follows agreements reached between the PM and Philippine President Ferdinand Marcos Jr. in Vancouver last July, which elevated the relationship to a strategic partnership, both sides working together in “adapting to the shifting global realities”.

There are some features of Canada-Philippine relations beyond trade that have not been given as much attention as they deserve, aspects which show that despite the depredations of the global trading order by current Chinese and US government leadership, respect for international law survives, even if the WTO-based multilateral system has been shattered by actions of these two giant economies.

From July of this year- President Ferdinand Marcos Jr. and Canadian Prime Minister Mark Carney visit the Granville branch of Jollibee in Vancouver, marking the brand’s 10th anniversary in Canada and celebrating its continued growth in the Canadian market. The Filipino fast-food chain plans to expand to more than 85 locations across Canada over the next five years, according to the Presidential Communications Office. |

: PCO via@luisacabatoINQ

In many ways, those aspects testify to the resilience and transcendency of the global trading order among like-minded states.

The actual texts have yet to be published, but it is clear these agreements will enshrine foundational WTO rules, such as non-discrimination in trade relations (MFN and national treatment) and respect for bound duty rates – elements that the Trump administration has trashed in its global trade wars.

Resilience Of International Law

This is what is meant by the “resilience of international law,” where rules are transcendent in spite of damaging assaults by major players.

In the case of the Philippines, there is another feature – Canada joining in a direct push-back to China’s aggressive expansion strategy into the South China Sea and its incursions into the Philippine’s maritime space. The joint announcement in Vancouver in July says the two leaders reiterated support for a rules-based order, and the 2016 Award by the Tribunal on the South China Sea Arbitration, which is final and binding.

The reference is to the Permanent Court of Arbitration’s ruling that found that China’s aggressive claims in the South China Sea were in violation of the Law of the Sea (LOS) Convention. It illustrates the fundamental point that among like-minded, middle-tier players on the global scene, there is ongoing respect for international law; testimony that the rules-based system is transcendent and survives attempts at hegemonic dominance and power-based actions.

And What About Canada Arctic Maritime Sovereignty?

And there are aspects here that are relevant to Canada’s own sovereignty and jurisdiction over its Arctic maritime areas. While not reading too much into this, by supporting international law and the rules-based order enshrined in the LOS convention and rejecting aggressive incursions by China into the Philippines maritime areas, the Carney government is signalling to others – notably China but not excluding the United States – that Canadian maritime sovereignty in the Arctic is sacrosanct.

These overarching aspects show that while there has been a deliberate shattering of the rules-based trading system at the multilateral level, combined with the equally deliberate weakening of the WTO as a global body, consensus-based rules continue to underpin inter-state relations at the regional and bilateral levels.

Without overstating the case, Canada’s enhanced arrangements with the Philippines carry signals to the global community that the wrecking ball of the Trump administration and the flouting of GATT/WTO rules by China cannot totally undo decades of development and application of international law among like-minded countries.

For The Silo, Lawrence Herman/C.D. Howe Institute.

The Building Canada Act Won’t Actually Build Anything In Canada?

The number of oil and gas projects in Ottawa’s major project inventory has fallen by 76 percent from its 2017 peak. This demonstrates a sustained erosion of investment confidence in Canada’s energy sector over the better part of a decade. 

To spur investment in natural resources, mining and electricity, Parliament enacted the Building Canada Act (BCA) last June to “urgently advance projects throughout Canada.” Almost a year later, and without designating any projects under the BCA, Ottawa has now announced further reforms aimed at “Getting Major Projects Built in Canada.”   

These reforms reflect the recognition that the current system isn’t working.  Numerous reports, studies, and indices have concluded Canada’s reputation as a place to invest and build has deteriorated. Meanwhile, everyone agrees that when project approvals become politicized, and regulators are asked to weigh broad policy factors, it reduces confidence in the Canadian system. 

Rather than creating a clearer and more predictable approvals framework, these changes expand federal discretion and further politicize the regulatory process.  

The BCA doubles down on political decision making. First, cabinet, ministers, and – in reality – the Prime Minister’s Office, are granted virtually unconstrained discretion to control both the decision on ultimate approvals along with the process to which national interest projects should be subject. This includes the removal or amendment of current legislation or other rules that apply to national interest projects. 

With this control, Ottawa can determine the outcome of the hearing prior to the consideration of evidence, and regulators will in essence go through the motions of conducting a review to produce a record that supports the government’s political determinations.  

Moreover, it is not clear whether the BCA process replaces the existing process or actually adds to it. The BCA states that designation does not exempt a proponent from taking all measures it is required to make under enacting legislation, the Canadian Energy Regulator Act or Impact Assessment Act, to receive authorization. This suggests the CER and Impact Assessment Agency continue to conduct a regulatory review based on existing legislation. This raises new uncertainties and gives the minister ultimate discretion to consider a limited set of factors when issuing a green light. 

Even in areas where regulatory review is required, such as safety and environmental impact, the BCA adds new considerations that do not precisely jibe with what needs to be considered under existing legislation. For example, the current CER Act requires consideration of how a pipeline may affect the protection of property and the environment. The BCA only requires consideration of safety and security of regulated facilities. While it is easy to say that the minister would in fact continue to consider the factors within the CER Act, the BCA doesn’t require it. 

Indeed, the BCA does not solve the problem that current proceedings require assessments on a wide range of policy that bear little relation to direct project risks. 

Hearings on policy issues like the intersection of sex and gender, and whether the effects of the project hinder or contribute to the government’s ability to meet its environmental and climate change obligations can dissolve into a time-consuming policy debate among proponents and intervenors. 

Project reviews should instead focus on core risks, such as safety, environmental impact, and the adequacy of Indigenous consultation. Especially since the types of projects being referred, and other major projects, are often those with known adverse effects. 

And what to make of the Major Projects Office’s role in these reforms? The BCA gives this office a limited coordinating function, while its website describes its role in broader terms, causing further confusion. 

The project office states it is tasked with evaluating projects for submission and referral to the MPO itself. However, the BCA states projects require evaluation and recommendation by the minister prior to being referred.   

Next the MPO states it will recommend whether projects should be designated as national interest projects. This contrasts the BCA, which requires this evaluation to be done by the minister following consultation with provinces and territories, and Indigenous peoples, on whether to order the formal designation. 

Finally, the MPO states its mandate includes resolving policy or regulatory challenges and reduced risk, providing financial structure or investment support as well as Indigenous engagement and consultation guidance. The BCA does not empower it to conduct these activities and it is unclear how a proponent (likely an experienced and well-financed company) might benefit from MPO coordination rather than existing federal departments, and the various funding agencies, such as the new Canada Strong Fund, Canada Infrastructure Bank, or the Canada Growth Fund, all of which have already committed to better coordination.  

Taken together, we argue the BCA and the MPO’s processes will not streamline project approvals nor improve predictability or good practice in Canada’s regulatory system. 

George Vegh is a Senior Fellow at the Munk School of Global Affairs & Public Policy. Kate Koplovich is a Senior Policy Analyst for Energy with the C.D. Howe Institute.